{"id":20728,"date":"2024-06-20T10:37:50","date_gmt":"2024-06-20T10:37:50","guid":{"rendered":"https:\/\/dev2.antsolutions.eu\/?p=20728"},"modified":"2025-11-28T11:30:54","modified_gmt":"2025-11-28T11:30:54","slug":"como-implementar-un-sistema-de-seguimiento-del-oee-sin-validacion-en-tres-meses-estudio-de-caso","status":"publish","type":"post","link":"https:\/\/dev2.accevo.com\/es\/blog\/how-to-implement-an-oee-monitoring-system-without-validation-in-3-months-case-study\/","title":{"rendered":"\u00bfC\u00f3mo implantar un sistema de seguimiento de la OEE sin validaci\u00f3n en 3 meses? - Caso pr\u00e1ctico.\u00a0\u00a0"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"20728\" class=\"elementor elementor-20728\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-654b7250 e-flex e-con-boxed e-con e-parent\" data-id=\"654b7250\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5cd2b433 elementor-widget elementor-widget-text-editor\" data-id=\"5cd2b433\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t\t\t<p><\/p>\n<p class=\"wp-block-paragraph\"><b>The pharmaceutical industry is one of the most demanding manufacturing industries. The combination of high process efficiency associated with the high volume of medicines produced, while maintaining the highest quality standards in compliance with strict regulatory standards, plays an important role here.\u00a0<\/b><\/p>\n<p><b>An effective way to maintain high production efficiency is to implement improvements and respond to changes based on the monitoring of the overall production efficiency index (OEE). Data is collected in real time, allowing areas for improvement to be identified at short notice. Eliminating bottlenecks located in this way contributes to increasing machine availability, reducing micro-downtime and thus increasing OEE.\u00a0<\/b><\/p>\n<p><b>The OEE monitoring system can be implemented within 3 months, without the need for validation, a task we carried out at one of our clients operating in the pharmaceutical industry.\u00a0<\/b><\/p>\n<p><\/p>\n<p><\/p>\n<figure id=\"attachment_11055\" aria-describedby=\"caption-attachment-11055\" style=\"width: 950px\" class=\"wp-caption aligncenter\"><img fetchpriority=\"high\" decoding=\"async\" class=\"wp-image-11055 size-full\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2022\/10\/pharma-panel-operatora-MMD9000.png\" alt=\"pharma-panel-operatora-MMD9000\" width=\"950\" height=\"720\" title=\"\" srcset=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2022\/10\/pharma-panel-operatora-MMD9000.png 950w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2022\/10\/pharma-panel-operatora-MMD9000-300x227.png 300w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2022\/10\/pharma-panel-operatora-MMD9000-768x582.png 768w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2022\/10\/pharma-panel-operatora-MMD9000-16x12.png 16w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><figcaption id=\"caption-attachment-11055\" class=\"wp-caption-text\">Operator Panels can help factory workers to track the production progress and react to stoppages and machine failures.<\/figcaption><\/figure>\n<p class=\"wp-block-paragraph\"><\/p>\n<p><\/p>\n<h2 class=\"wp-block-heading\"><strong>Monitoring Production Efficiency &#8211; OEE monitoring system capabilities<\/strong>\u00a0<\/h2>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">The OEE monitoring system allows data to be collected from machines and equipment. Depending on the equipment on the line, this is done through PLC sensors, signal duplication or the installation of sensors in the form of external devices. The data collected is essential for further analysis and the generation of real-time OEE reports, so correct data collection plays a key role in the performance monitoring process.<\/p>\n<p>\u00a0When choosing a partner to implement the software, it is worth considering their experience in machine integration. The selection of a suitable method of integration with machines and the correct installation of high-performance sensors ensures that the reports and analyses created on the basis of the collected data will reflect the actual situation on the production floor.\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<h2 class=\"wp-block-heading\"><strong>Why invest in efficiency improvements?\u00a0<\/strong>\u00a0<\/h2>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">Imagine the case of an increase in OEE from 40 to 50%. This results in an increase in production volumes of 25%. If the company has 4 production lines, such an increase in OEE means the equivalent of one additional line with the same machinery and number of employees.\u00a0\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">The implementation of the system at the client&#8217;s site allowed real-time calculation of OEE and access to historical data to track progress. The system has also facilitated a reliable root cause analysis of production performance &#8211; detailed reports make it possible to analyse losses, types of downtime and breakdowns, and thanks to the data in the Pareto chart, it was quickly found out which events generate the greatest delays. The dashboards installed on the production floor made it possible to view current production and to react quickly in the event of apparent problems with the correct execution of processes. In the case of the implementation of a production efficiency monitoring system in the pharmaceutical plant discussed in this article, there was <strong>an increase in OEE from 44% to 54%.<\/strong>\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<figure id=\"attachment_20758\" aria-describedby=\"caption-attachment-20758\" style=\"width: 950px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-20758 size-full\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_performance_pc_950.png\" alt=\"\" width=\"950\" height=\"780\" title=\"\" srcset=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_performance_pc_950.png 950w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_performance_pc_950-300x246.png 300w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_performance_pc_950-768x631.png 768w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_performance_pc_950-15x12.png 15w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><figcaption id=\"caption-attachment-20758\" class=\"wp-caption-text\">Screenshot of the system. Analytics and reports. View of production performance.\u00a0<\/figcaption><\/figure>\n<p class=\"wp-block-paragraph\"><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\"><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">What about the validation of an OEE monitoring system? This type of software does not necessarily need to be validated, although it can be beneficial in certain situations. In the case of OEE monitoring, this is not required as the production process, product quality and patient health are not affected, and data is collected on a one-way basis. If monitoring is only needed for internal purposes, such as tracking performance and identifying areas for improvement, validation is not necessary. It is enough to be sure that the system is properly calibrated and working properly. Validation, on the other hand, is necessary if the system is used for batch report generation, quality control or the system guides operators through the BULK process. Validation is therefore performed at the time of software development for the MES system. Electronic batch reports (EBR), quality checks carried out in the system, as well as material validation and BULK handling require the reliability of the software to be demonstrated to monitor production efficiency.\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">Example of implementation of OEE monitoring of packaging lines without validation in 3 months in a pharmaceutical company\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">We performed the implementation of OEE monitoring of packaging lines in a pharmaceutical company. The scope of the system included:\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<ul class=\"wp-block-list\">\n<li style=\"list-style-type: none;\">\n<ul><\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>OEE monitoring for 7 blister packing lines,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>monitoring of micro-breaks,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>integration with SAP,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>installation of equipment: Data Activation, Operator Panels, TV.\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">The company wanted to achieve the following business objectives:\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<ul class=\"wp-block-list\">\n<li style=\"list-style-type: none;\">\n<ul><\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>automatic downloading of real-time data,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>increasing the availability of production lines,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>reduction in micro-breaks,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>reducing Maintenance&#8217;s response time,\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>the possibility of introducing an Electronic Series Report.\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">Machine data was downloaded through direct integration with Beckhoff and Siemens S7-1200 and S7-300 controllers. Data was downloaded from machines\/equipment such as the blister machine, checkweigher, serialiser and cartoner. The data collected reported, among other things, on products accepted and rejected, automatic, manual and emergency stops or alarm messages. Data collection was done in a process-neutral manner.\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">During the implementation in question, Accevo was responsible for the entire process, including hardware installation, cable routing, system implementation and ERP integration. The implementation schedule comprised 12 weeks of work, and the completion of the work at each stage is shown in the schedule below.\u00a0\u00a0<\/p>\n<figure id=\"attachment_12706\" aria-describedby=\"caption-attachment-12706\" style=\"width: 1024px\" class=\"wp-caption aligncenter\"><img decoding=\"async\" class=\"wp-image-12706 size-large\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2022\/12\/ant-quick-implementation-dark-1024x839.png\" alt=\"how to implement production system scheme\" width=\"1024\" height=\"839\" title=\"\"><figcaption id=\"caption-attachment-12706\" class=\"wp-caption-text\">Graphic 1: Project implementation schedule in 3 months<\/figcaption><\/figure>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\"><span style=\"text-align: var(--text-align);\">We performed a comprehensive implementation. As a service provider, we handled all processes from project start-up and analysis to testing and launch. The direct exchange of information with the client at each stage of the work allowed us to streamline communication, so that we met all the expectations of the client. As a result, after 12 weeks, the client received from us tested and ready-to-run software, without the need for system validation.\u00a0<\/span><\/p>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<figure id=\"attachment_20761\" aria-describedby=\"caption-attachment-20761\" style=\"width: 950px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-20761 size-full\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_BatchRecord_PC_950.png\" alt=\"\" width=\"950\" height=\"780\" title=\"\" srcset=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_BatchRecord_PC_950.png 950w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_BatchRecord_PC_950-300x246.png 300w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_BatchRecord_PC_950-768x631.png 768w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2024\/06\/pharma_BatchRecord_PC_950-15x12.png 15w\" sizes=\"(max-width: 950px) 100vw, 950px\" \/><figcaption id=\"caption-attachment-20761\" class=\"wp-caption-text\">Screenshot of the system. Analysis of machine uptime and causes of downtime. <span style=\"font-size: 16px;\">\u00a0<\/span><\/figcaption><\/figure>\n<p class=\"wp-block-paragraph\"><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">What results have been achieved?\u00a0<\/p>\n<p><\/p>\n<p><\/p>\n<ul class=\"wp-block-list\">\n<li style=\"list-style-type: none;\">\n<ul><\/ul>\n<\/li>\n<\/ul>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>One year after implementation, OEE increased from 44% to 52%\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>Reduced 27% of micro-dropouts\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>MTTR value reduced by 33%\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<ul>\n<li style=\"list-style-type: none;\">\n<ul>\n<li>A production volume equivalent to one additional packaging line was achieved.\u00a0<\/li>\n<\/ul>\n<\/li>\n<\/ul>\n<p><\/p>\n<p><\/p>\n<p><\/p>\n<h2 class=\"wp-block-heading\"><strong>Implementation of an OEE monitoring system &#8211; summary of benefits<\/strong>\u00a0<\/h2>\n<p><\/p>\n<p><\/p>\n<p class=\"wp-block-paragraph\">In the case discussed, it took only three months to implement a ready-made OEE monitoring system without validation. One of the main business objectives was to increase the availability of production lines and this goal was achieved. Reducing micro-downtimes by \u00bc and reducing MTTR by \u2153 resulted in an OEE increase of 8% within the first year of implementation.\u00a0<\/p>\n<p><\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<section class=\"elementor-section elementor-top-section elementor-element elementor-element-17fdf36 elementor-section-boxed elementor-section-height-default elementor-section-height-default\" data-id=\"17fdf36\" data-element_type=\"section\" data-e-type=\"section\">\n\t\t\t\t\t\t<div class=\"elementor-container elementor-column-gap-default\">\n\t\t\t\t\t<div class=\"elementor-column elementor-col-100 elementor-top-column elementor-element elementor-element-7573671\" data-id=\"7573671\" data-element_type=\"column\" data-e-type=\"column\">\n\t\t\t<div class=\"elementor-widget-wrap elementor-element-populated\">\n\t\t\t\t\t\t<div class=\"elementor-element elementor-element-4b06885 elementor-widget elementor-widget-heading\" data-id=\"4b06885\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Art\u00edculos relacionados<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-bcbd790 elementor-grid-3 elementor-grid-tablet-2 elementor-grid-mobile-1 elementor-posts--thumbnail-top elementor-card-shadow-yes elementor-posts__hover-gradient elementor-widget elementor-widget-posts\" data-id=\"bcbd790\" data-element_type=\"widget\" data-e-type=\"widget\" data-settings=\"{&quot;cards_columns&quot;:&quot;3&quot;,&quot;cards_columns_tablet&quot;:&quot;2&quot;,&quot;cards_columns_mobile&quot;:&quot;1&quot;,&quot;cards_row_gap&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:35,&quot;sizes&quot;:[]},&quot;cards_row_gap_laptop&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;cards_row_gap_tablet&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]},&quot;cards_row_gap_mobile&quot;:{&quot;unit&quot;:&quot;px&quot;,&quot;size&quot;:&quot;&quot;,&quot;sizes&quot;:[]}}\" data-widget_type=\"posts.cards\">\n\t\t\t\t<div class=\"elementor-widget-container\">\n\t\t\t\t\t\t\t<div class=\"elementor-posts-container elementor-posts elementor-posts--skin-cards elementor-grid\" role=\"list\">\n\t\t\t\t<article class=\"elementor-post elementor-grid-item post-15798 page type-page status-publish has-post-thumbnail hentry\" role=\"listitem\">\n\t\t\t<div class=\"elementor-post__card\">\n\t\t\t\t<a class=\"elementor-post__thumbnail__link\" href=\"https:\/\/dev2.accevo.com\/es\/laboratory-information-management-system-lims-system\/\" tabindex=\"-1\"><div class=\"elementor-post__thumbnail\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web-1024x576.jpg\" class=\"attachment-large size-large wp-image-24221\" alt=\"\" srcset=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web-1024x576.jpg 1024w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web-300x169.jpg 300w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web-768x432.jpg 768w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web-1536x864.jpg 1536w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web-18x10.jpg 18w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/lims-bg-2025-web.jpg 1920w\" sizes=\"(max-width: 800px) 100vw, 800px\" title=\"\"><\/div><\/a>\n\t\t\t\t<div class=\"elementor-post__text\">\n\t\t\t\t<h3 class=\"elementor-post__title\">\n\t\t\t<a href=\"https:\/\/dev2.accevo.com\/es\/laboratory-information-management-system-lims-system\/\">\n\t\t\t\tSistema de gesti\u00f3n de la informaci\u00f3n de laboratorio (Sistema LIMS)\t\t\t<\/a>\n\t\t<\/h3>\n\t\t\t\t<div class=\"elementor-post__excerpt\">\n\t\t\t<p>Sistema de gesti\u00f3n de la informaci\u00f3n de laboratorio (LIMS). El LIMS automatiza las operaciones de laboratorio, mejorando la eficiencia del flujo de trabajo. Reserva una presentaci\u00f3n de Accevo LIMS. Accevo te ofrece la soluci\u00f3n de informaci\u00f3n de laboratorio m\u00e1s completa<\/p>\n\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-post__read-more-wrapper\">\n\t\t\n\t\t<a class=\"elementor-post__read-more\" href=\"https:\/\/dev2.accevo.com\/es\/laboratory-information-management-system-lims-system\/\" aria-label=\"M\u00e1s informaci\u00f3n sobre Laboratory Information Management System (LIMS System)\" tabindex=\"-1\">\n\t\t\tLeer M\u00e1s \"\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/article>\n\t\t\t\t<article class=\"elementor-post elementor-grid-item post-16061 post type-post status-publish format-standard has-post-thumbnail hentry category-blog tag-quality\" role=\"listitem\">\n\t\t\t<div class=\"elementor-post__card\">\n\t\t\t\t<a class=\"elementor-post__thumbnail__link\" href=\"https:\/\/dev2.accevo.com\/es\/blog\/maintaining-data-integrity-in-cgmp-compliance\/\" tabindex=\"-1\"><div class=\"elementor-post__thumbnail\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs-1024x576.jpg\" class=\"attachment-large size-large wp-image-24705\" alt=\"\" srcset=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs-1024x576.jpg 1024w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs-300x169.jpg 300w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs-768x432.jpg 768w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs-1536x864.jpg 1536w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs-18x10.jpg 18w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2023\/09\/Maintaining-Data-Integrity-2025-gs.jpg 1920w\" sizes=\"(max-width: 800px) 100vw, 800px\" title=\"\"><\/div><\/a>\n\t\t\t\t<div class=\"elementor-post__badge\">Blog<\/div>\n\t\t\t\t<div class=\"elementor-post__text\">\n\t\t\t\t<h3 class=\"elementor-post__title\">\n\t\t\t<a href=\"https:\/\/dev2.accevo.com\/es\/blog\/maintaining-data-integrity-in-cgmp-compliance\/\">\n\t\t\t\tMantener la integridad de los datos en el cumplimiento de las cGMP\t\t\t<\/a>\n\t\t<\/h3>\n\t\t\t\t<div class=\"elementor-post__excerpt\">\n\t\t\t<p>La integridad de los datos es el eje de la fabricaci\u00f3n farmac\u00e9utica seg\u00fan las Buenas Pr\u00e1cticas de Fabricaci\u00f3n Actuales (cGMP). Garantiza la exactitud de los datos generados a lo largo del proceso de fabricaci\u00f3n,<\/p>\n\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-post__read-more-wrapper\">\n\t\t\n\t\t<a class=\"elementor-post__read-more\" href=\"https:\/\/dev2.accevo.com\/es\/blog\/maintaining-data-integrity-in-cgmp-compliance\/\" aria-label=\"M\u00e1s informaci\u00f3n sobre Maintaining Data Integrity in cGMP Compliance\" tabindex=\"-1\">\n\t\t\tLeer M\u00e1s \"\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/article>\n\t\t\t\t<article class=\"elementor-post elementor-grid-item post-6672 page type-page status-publish has-post-thumbnail hentry\" role=\"listitem\">\n\t\t\t<div class=\"elementor-post__card\">\n\t\t\t\t<a class=\"elementor-post__thumbnail__link\" href=\"https:\/\/dev2.accevo.com\/es\/products\/electronic-batch-records-ebr\/\" tabindex=\"-1\"><div class=\"elementor-post__thumbnail\"><img loading=\"lazy\" decoding=\"async\" width=\"800\" height=\"450\" src=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web-1024x576.jpg\" class=\"attachment-large size-large wp-image-24197\" alt=\"\" srcset=\"https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web-1024x576.jpg 1024w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web-300x169.jpg 300w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web-768x432.jpg 768w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web-1536x864.jpg 1536w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web-18x10.jpg 18w, https:\/\/dev2.accevo.com\/wp-content\/uploads\/2025\/10\/EBR-bg-2025-web.jpg 1920w\" sizes=\"(max-width: 800px) 100vw, 800px\" title=\"\"><\/div><\/a>\n\t\t\t\t<div class=\"elementor-post__text\">\n\t\t\t\t<h3 class=\"elementor-post__title\">\n\t\t\t<a href=\"https:\/\/dev2.accevo.com\/es\/products\/electronic-batch-records-ebr\/\">\n\t\t\t\tSoftware de registro electr\u00f3nico de lotes (EBR)\t\t\t<\/a>\n\t\t<\/h3>\n\t\t\t\t<div class=\"elementor-post__excerpt\">\n\t\t\t<p>Software de registros electr\u00f3nicos de lotes (EBR): una soluci\u00f3n digital para optimizar la gesti\u00f3n de lotes. El software de registros electr\u00f3nicos de lotes (EBR) sustituye a los registros de lotes tradicionales en papel y ofrece orientaci\u00f3n digital.<\/p>\n\t\t<\/div>\n\t\t\t\t\t<div class=\"elementor-post__read-more-wrapper\">\n\t\t\n\t\t<a class=\"elementor-post__read-more\" href=\"https:\/\/dev2.accevo.com\/es\/products\/electronic-batch-records-ebr\/\" aria-label=\"M\u00e1s informaci\u00f3n sobre Electronic Batch Records (EBR) Software\" tabindex=\"-1\">\n\t\t\tLeer M\u00e1s \"\t\t<\/a>\n\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/article>\n\t\t\t\t<\/div>\n\t\t\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t<\/section>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>The pharmaceutical industry is one of the most demanding manufacturing industries. The combination of high process efficiency associated with the high volume of medicines produced, while maintaining the highest quality standards in compliance with strict regulatory standards, plays an important role here.\u00a0 An effective way to maintain high production efficiency is to implement improvements and [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":24668,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[30],"tags":[54],"class_list":["post-20728","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog","tag-production"],"_links":{"self":[{"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/posts\/20728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/comments?post=20728"}],"version-history":[{"count":0,"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/posts\/20728\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/media\/24668"}],"wp:attachment":[{"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/media?parent=20728"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/categories?post=20728"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dev2.accevo.com\/es\/wp-json\/wp\/v2\/tags?post=20728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}